Knox Lee - South EastmanTransmission Improvements Project


Southwestern Electric Power Company (SWEPCO) officials plan to strengthen the electric grid in the Longview area by rebuilding about 7 miles of 138-kilovolt (kV) transmission line.

The transmission line was constructed in 1951 and is past its planned service life.

The project:

  • Replaces deteriorating wooden poles with modern steel poles
  • Strengthens the system against severe weather impacts
  • Decreases the likelihood and duration of wide, community-sustained outages
  • Removes woody-stemmed vegetation that could impact the safe operation of the transmission line

Timeline

 
Project Timeline
 

Structures

Structure

Typical Height: Approximately 100 feet*
Typical Distance Between Structures: Approximately 550 feet*
Typical Right-of-Way Width: Approximately 100 feet*

*Exact structure types, height and right-of-way requirements may vary

Resources

Property Easements Project Fact Sheet Project Map Access Roads Field Activities

AEP Texas serves more than 900,000 electric consumers in the deregulated Texas marketplace.

www.AEPTexas.com

Katelyn Hahn

Project Outreach Specialist
833-329-4865
swepco_outreach@aep.com

Submit a Message

*Required field. By clicking submit, you agree to AEP's Privacy Policy.

Please complete the ReCAPTCHA to submit the form. If you have difficulty, use the audio challenge option.

Paper plane

Your message has been sent! We'll be in touch shortly.