Hamilton Road - PicachoTransmission Line Project


AEP Texas representatives plan to upgrade the local electric transmission grid in Val Verde County. The Hamilton Road - Picacho Transmission Line Rebuild Project involves upgrading about 8 miles of electric transmission line to enhance electric reliability for area customers.

Timeline

Project Timeline

Structures

Structure

AEP Texas will replace existing H-frame structures with steel single-pole structures that will be about 80-100 feet tall. The structures will be placed in an approximate 100-foot right-of-way corridor.

Typical Structure Height: 105 feet*
Typical Right-of-Way Width: 100 feet*
Typical Distance Between Structures: 850 feet*

*Exact structure types, height and right-of-way requirements may vary

Resources

Project Fact Sheet Project Map Access Roads Field Activities

AEP Texas serves more than 900,000 electric consumers in the deregulated Texas marketplace.

www.AEPTexas.com

Adriana Knight

Project Outreach Specialist
833-329-4865
aaknight@aep.com

* Required field. By clicking submit, you agree to AEP's Privacy Policy.

Paper plane

Your message has been sent! We'll be in touch shortly.