translate-globe-icon

Cornville - CyrilTransmission Line Rebuild Project


Public Service Company of Oklahoma (PSO) representatives plan to upgrade the electric transmission system in Grady and Caddo counties. Crews plan to begin construction in early spring 2023 and conclude in early fall 2023.

This project involves rebuilding about 18 miles of power line with steel single-pole structures and upgrading area substations to increase electric reliability for customers, reduce maintenance frequency and strengthen the line against weather and other environmental impacts.

Project Updates

Fall 2023: Crews and PSO representatives completed construction on this rebuild project and placed facilities in service on Sept. 22, 2023.

Early 2023: As PSO representatives prepare to rebuild the line, crews plan to begin installing gates and culverts in early February on select properties along the power line route. The gates and culverts allow PSO representatives to safely access areas within the company’s easements. PSO representatives plan to begin construction in early March in western Grady County working toward the structure in southwest Chickasha. Following that, crews plan to work back toward the Cyril Substation and conclude there in early fall 2023.

Fall 2021: PSO crews and contractors plan to perform surveying work in fall 2021 within the utility's right-of-way along and adjacent to the line route. Some of the survey work may require crews to place stakes and ribbon within the company's easement* on your property. Crews plan to use existing streets and pathways wherever possible to access the easement area. PSO takes responsibility should any damage result from the surveying work.

* Company representatives plan to rebuild the power line in the existing right-of-way, which may require acquiring new or updating existing property easements. Easements are defined land rights that property owners grant the utility to allow for the safe construction, operation and maintenance of the power line.

Map

Project Map (PDF)

Timeline

Project Timeline

Structures

Structure

This project involves the use of single steel poles.

Typical Structure Height: Approximately 95 feet*
Typical Distance Between Structures: 600 feet *
Typical Right-of-Way Width: 100 feet

* Exact structure, height and right-of-way may vary

Resources

Project Fact Sheet Access Roads Field Activities

Public Service Company of Oklahoma serves 538,000 customers in Oklahoma.

www.PSOklahoma.com

Matthew Hames

Project Outreach Specialist
918-237-6736
mchames@aep.com

* Required field. By clicking submit, you agree to AEP's Privacy Policy.

Paper plane

Your message has been sent! We'll be in touch shortly.