ShadysideTransmission Line Extension Project


AEP Ohio representatives plan power grid upgrades to improve electric reliability for customers in Mead Township and the village of Shadyside. The Shadyside Transmission Line Extension Project involves building approximately 2 miles of 69-kilovolt power line and retiring about 2 miles of power line.

Company representatives plan to build the power line in an approximate 50-100 foot right-of-way corridor and plan to acquire new property easements to ensure the safe construction, operation and maintenance of the line. Easements are defined land rights that property owners grant the utility to allow for the safe construction, operation and maintenance of the power line. Crews expect to begin construction fall 2026 and conclude summer 2028.

Project Updates

Summer 2024: Final Line route was announced.

Property ROW LLC (PROW), serves as AEP Ohio’s right-of-way representative on this project. Landowners along the proposed power line route can expect to hear from a PROW right-of-way agent in the upcoming weeks.

If you want to reach out to a right-of-way agent with immediate questions, please contact Bill Piko at 304-280-0096 or email at bpiko@propertyrow.com.

Timeline

 
Project Timeline
 

Structures

Structure

This project involves the use of single steel poles.

Proposed Structure Height: 80 feet*
Right-of-Way Width: 50-100 feet*

*Exact structure, height and right-of-way requirements may vary

Resources

Property Easements Project Fact Sheet Access Roads Field Activities

AEP Ohio provides electricity to nearly 1.5 million customers.

www.AEPOhio.com

AEP Ohio Outreach

614-933-2998
AEPOhio_Outreach@aep.com

Submit a Message

*Required field. By clicking submit, you agree to AEP's Privacy Policy.

Please complete the ReCAPTCHA to submit the form. If you have difficulty, use the audio challenge option.

Paper plane

Your message has been sent! We'll be in touch shortly.