AEP Ohio representatives plan power grid upgrades to improve electric reliability for customers in Delaware and Union counties.
The Marysville-Hyatt 345 kV Transmission Line Rebuild Project involves:
Company representatives plan to rebuild the power line in the existing 150-foot-wide right-of-way corridor. Existing easements may need to be updated to ensure the safe construction, operation and maintenance of the line.
* This project requires regulatory approval from the Ohio Power Siting Board (OPSB)
Fall 2025: AEP Ohio representatives announce the Marysville-Hyatt 345 kV Transmission Line Rebuild Project.
Property owners along the power line route will be contacted by O.R. Colan (ORC), the right-of-way vendor representing AEP Ohio for this project. If you want to reach out to a right-of-way agent with immediate questions, please contact Andy Bell with OR Colan at 419-631-4399 or abell@orcolan.com.
The project involves the use of BOLD structures.
Typical Pole Height: Approximately 150 feet*
Typical Right-of-Way Width: Approximately 150 feet*
*Exact structure types, height and right-of-way requirements may vary
AEP Ohio provides electricity to nearly 1.5 million customers.