AEP Texas representatives plan to upgrade the electric transmission grid in Laredo by installing new wire, or conductor, to the existing transmission line and poles. The North Laredo Transmission Improvements Project involves upgrading approximately 12 miles of 138-kilovolt (kV) electric transmission line to enhance electric reliability.

Project Updates

The project team will begin installing wire, or conductor, along the existing transmission line structures beginning January 2024.