AEP Texas representatives plan to upgrade the electric transmission grid in Laredo by replacing the wires, or conductor, along the existing transmission line route. The Laredo - University Transmission Improvements Project involves upgrading approximately 5 miles of 138-kilovolt (kV) electric transmission line to enhance electric reliability.
The project team will begin installing wire, or conductor, along the existing transmission line structures beginning fall 2023.
AEP Texas serves more than 900,000 electric consumers in the deregulated Texas marketplace.
Project Outreach Specialist
833-329-4865
aaknight@aep.com