    Trade Zone 138-kilovolt Substation

    The Trade Zone 138-kilovolt (kV) Substation project includes plans to build the new Trade Zone 138-kV Substation in south McAllen and connect the substation to the existing South McAllen - Las Milpas 138-kV transmission line. Plans also involve completing minor upgrades to the distribution system before connecting it to the new substation.

    Project Updates

    Work to prepare the area for construction will begin in April 2019, weather permitting.

    Post Card

    Maps

    Timeline

    Substation Construction: Spring 2019 - Summer 2020
    Line Construction: Fall 2019 - Summer 2020
    In-Service Date: Summer 2020

    Facilities

    Trade Zone Substation facilities will be approximately 230 feet x 230 feet within a 5 acre area.

    Plans include creating a detention basin at the entrance to the substation approximately 145 feet x 100 feet and approximately 4 feet deep.

    The detention basin helps protect the area around the substation against flooding when large amounts of rainfall occur. The detention basin is designed to hold water for a limited amount of time to allow for draining.

    *Substation shown is a general depiction of the proposed facilities that will be built for this project. This picture does not represent final design.


    * The accompanying map depicts the project area. It should be noted that the map contained on this site is for information purposes only. AEP reserves the right to alter, change, or amend the map at any time without notice and AEP provides no warranty about the accuracy of content. Keep this in mind when reviewing this map. However, AEP will make all attempts to keep this map as accurate as possible. If you have any questions about the accuracy of the current map please Contact Us.