    Cannonsburg Transmission Line Rebuild Project

    Kentucky Power plans to strengthen the transmission system in eastern Kentucky by upgrading its existing infrastructure. The Cannonsburg Transmission Line Rebuild Project consists of rebuilding approximately 5 miles of transmission line to increase electric reliability and reduce the likelihood of extended outages. Construction is currently underway and is expected to be complete by the end of 2019.

    Project Updates

    4/01/2019 -  The Cannonsburg Transmission Line Rebuild Project continues with tree clearing and construction of access roads. Construction of the transmission line is expected to begin this summer and conclude by the end of the year. 

    10/15/18 -- Crews have begun clearing trees and building access roads to assist in the rebuilding of the transmission line. 

    5/17/2018 - Kentucky Power held an open house on March 21 to introduce proposed study segments and answer questions related to the project. The right-of-way contractor, Emerald Energy, will begin reaching out to affected property owners.

    3/07/2018 - Kentucky Power will hold an informational open house to share project information. The open house will be held from 5:30 to 7:30 p.m., Wednesday March 21 at Ponderosa Elementary School. Company representatives will answer questions, share details about the project and gather public input.

    News Releases

    Maps

    Fact Sheet

    Timeline

    Structures

    Structures along the route will be about 75 feet tall. The typical right-of-way will be about 100 feet wide. Kentucky Power is replacing aluminum structures with galvanized steel H-frame structures.

    *Exact structure may vary depending on location.


    * The accompanying map depicts the project area. It should be noted that the map contained on this site is for information purposes only. AEP reserves the right to alter, change, or amend the map at any time without notice and AEP provides no warranty about the accuracy of content. Keep this in mind when reviewing this map. However, AEP will make all attempts to keep this map as accurate as possible. If you have any questions about the accuracy of the current map please Contact Us.