Tidd-Wagenhals 138kV Transmission Line Extension

AEP Ohio plans improve the electric transmission and distribution power grid in Carroll County. The Tidd-Wagenhals 138kV Transmission Line Extension consists of building a 138-kilovolt (kV) transmission line that will power a new substation. The projected costs of the upgrades are approximately $1 million, an investment that will enhance reliability and accommodate future growth in the region by strengthening the electric infrastructure.

The company plans to construct the new Tidd-Wagenhals 138kV transmission line in Brown Township in Carroll County. The new transmission line will be less than a half mile long.

Project Updates

The Ohio Power Siting Board granted approval to construct this project on September 6, 2017. Construction is underway on this project. Structures and equipment are being installed.

Project Releases

Fact Sheet

Timeline


Structures

 

Proposed Structures

Single-pole, steel structures have been selected for the new section of transmission line that will provide power to the substation. This will minimize the physical impact of the facilities. Poles will be approximately 120 feet tall.

*Exact structure, height and right-of-way may vary


* The accompanying map depicts the project area. It should be noted that the map contained on this site is for information purposes only. AEP reserves the right to alter, change, or amend the map at any time without notice and AEP provides no warranty about the accuracy of content. Keep this in mind when reviewing this map. However, AEP will make all attempts to keep this map as accurate as possible. If you have any questions about the accuracy of the current map please Contact Us.